BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//ChamberMaster//Event Calendar 2.0//EN
METHOD:PUBLISH
X-PUBLISHED-TTL:P3D
REFRESH-INTERVAL:P3D
CALSCALE:GREGORIAN
BEGIN:VEVENT
DTSTART:20171019T183000Z
DTEND:20171019T200000Z
X-MICROSOFT-CDO-ALLDAYEVENT:FALSE
SUMMARY:IBA Gerald Desmond Bridge Replacement Project
DESCRIPTION:Please join us as Duane L. Kenagy\, Interim Deputy Executive Director\, Port of Long Beach\, updates us on the Gerald Desmond Bridge Replacement Project.  As we all know\, the bridge is a major commuter corridor\, but built in the 1960's\, was not designed to handle today's traffic volumes.  This replacement project will not only ensure the safety of commuters and truck drivers but will also support about 3\,000 jobs.
X-ALT-DESC;FMTTYPE=text/html:<span style="font-size:16px\;"><span style="font-family:tahoma\;">Please join us as <strong>Duane L. Kenagy\,</strong> Interim Deputy Executive Director\, <strong>Port of Long Beach</strong>\, updates us on the <strong>Gerald Desmond Bridge Replacement Project.</strong>&nbsp\; As we all know\, the bridge is a major commuter corridor\, but built in the 1960&#39\;s\, was not designed to handle today&#39\;s traffic volumes.&nbsp\; This replacement project will not only ensure the safety of commuters and truck drivers but will also support about 3\,000 jobs.</span></span>
LOCATION:Long Beach Airport Marriott 4700 Airport Plaza Drive\, Long Beach\, CA 90815
UID:e.1956.4208
SEQUENCE:3
DTSTAMP:20260415T044223Z
URL:http://lbchamber.chambermaster.com/events/details/iba-gerald-desmond-bridge-replacement-project-4208
END:VEVENT

END:VCALENDAR
